Manchester Terminal 3

BOND-SEAL

Manchester Airport Engineering Services Department were looking for a sustainable maintenance treatment to cover all their old red footpaths and walkways around the terminal buildings. If successful it would be rolled out to cover all remaining red surfaces

Site: Terminal 3

Client: Manchester Airport

Department: Engineering Services

Main Contractor: R&M Dev

Specialist Surfacing Contractor:  Road Maintenance Services Limited

Process: RMS Impressions Range

Aggregate Finish: Footpaths in Impressions Black

Area: 2,210 m2

Completed: November 2010